Velocity 2010: James Hamilton, "Datacenter Infrastructure Innovation"
O'Reilly1 HN recommender · recommended in 1 month, 2010-2023
9K views · 16 years ago · talk · dated
James Hamilton of AWS gives a Velocity 2010 keynote on datacenter infrastructure innovation, focused on power and cooling costs and a breakdown of where datacenter spending goes.
HN points to it for Hamilton's datacenter cost breakdown and as a primary source for claims about power versus hardware costs.
1:33:27AWS re:Invent 2016: Tuesday Night Live with James Hamilton
Amazon Web Services
133K views • 9 years ago
47:51AWS re:Invent 2014: AWS Innovation at Scale with James Hamilton (SPOT301)
Amazon Web Services
70K views • 11 years ago
5:28Inside a Google data center
Google Workspace
22.6M views • 11 years ago
46:23High Volume, Bandwidth Heavy Infrastructure On The Cheap - Kyle Drake
PDX Node
1K views • 9 years ago
28:21Velocity 2012: Richard Cook, "How Complex Systems Fail"
O'Reilly
60K views • 14 years ago
15:14Velocity 2011: Jon Jenkins, "Velocity Culture"
O'Reilly
52K views • 15 years ago
31:10Exposing The Dark Side of America's AI Data Center Explosion | View From Above | Business Insider
Business Insider
8.2M views • 1 year ago
46:22Velocity 09: John Allspaw and Paul Hammond, "10+ Deploys Pe
O'Reilly
119K views • 17 years ago
19:10Velocity NY 2013: Richard Cook, "Resilience In Complex Adaptive Systems"
O'Reilly
47K views • 13 years ago
28:14Mikey Dickerson Velocity NY 2014 Keynote: "One Year After healthcare.gov..."
O'Reilly
19K views • 12 years ago
52:41Seattle Conference on Scalability: YouTube Scalability
Google TechTalks
30K views • 19 years ago
1:21:20A New Way to look at Networking
Google TechTalks
30K views • 19 years ago
1:14:19NYC Tech Talk Series: How Google Backs Up the Internet
Google TechTalks
41K views • 12 years ago
1:21:16A New Way to look at Networking
Google
52K views • 19 years ago
42:57Tesla Virtual Power Plant
InfoQ
36K views • 6 years ago
47:18OpenFlow @ Google - Urs Hoelzle, Google
Open Networking Summit
47K views • 14 years ago
55:44AWS re:Invent 2018: How AWS Minimizes the Blast Radius of Failures (ARC338)
Amazon Web Services
37K views • 7 years ago
1:19:06Netdev 0x16 - Keynote: It's Time to Replace TCP in the Datacenter
netdevconf
5K views • 3 years ago
28:11Why Everyone Is Talking About Data Centers In Space
Scott Manley
408K views • 10 months ago
42:20"Stop Rate Limiting! Capacity Management Done Right" by Jon Moore
Strange Loop Conference
41K views • 9 years ago
4 comments from Hacker News
According to James Hamilton who is a distinguished engineer at AWS no: link and link And you can watch him say it too: ▶ this video
The comment in general may be true but I don't see electricity costs being "much greater than CPU purchase costs over the lifespan" at least not for a data center operator. The AWS M4 EC2 instance uses "2.3 GHz Intel Xeon® E5-2686 v4 (Broadwell) processors or 2.4 GHz Intel Xeon® E5-2676 v3 (Haswell) processors" [0] so about 4-6 years old and may approach 7 years. A comparable processor Intel® Xeon® Processor E5-2670 v3 costs about $ 1600 [1] in bulk. Average US home electricity price is ~ 0.13 $/month [2], this would probably be much lower for a data center operator. The mentioned processors probably consume ~ 150 W at full load, which will probably not be the case most of the time. Anyway, let's see: CPU cost over its life time may be on the order of 1600 USD, which is quite cheap as today's top processors cost usually between 4000 and 8000 USD. [3] The electricity cost would probably be: 24 hours * 365 days * 7 years * 0.13 $/kWh * 0.15 kW ~ 1200 USD which seems about right. We can observe the electricity cost per CPU to be significantly lower than the purchase price of a rather cheap processor even assuming very generous CPU load and electricity price, while assuming rather low CPU cost. This of course doesn't include the mainboard, RAM, NIC, power conversion, cooling and other hardware that is needed to operate a modern data center. On the other hand, the cost of this hardware wasn't included in the calculation either. Of course, I am not the only one to do the calculatio
I may be missing something, but that post doesn't address the expense of power, it talks about the relative consumption of networking equipment compared to the rest of the facility. Power is expensive, and James Hamilton generally spends lots of time talking about it, his Velocity keynote ( ▶ this video ) about datacenter innovations focused primarily on power and cooling (heat being a biproduct of power consumption).
That split of where the money goes comes directly from calculations and a spreadsheet that James Hamilton has developed. You should check out his Velocity talk for more (about 5 minutes in) ▶ this video The numbers on the slides modify the assumptions on the spreadsheet at link